sibp_1_2

sibp_1_2

    Stamper Industrial Building Project

    Having had an experience of working with inductrial buildings (the depo we designed several years ago) has made great contributions to the desşgn of the current one, We have created the wooden facade that highlights the office and forms the identity of the building.

    The project, which is located in the center of a densely industrial area, is aimed to raise a sustainability awareness in the region. By choosing natural materials we would like to emphasize the interaction between humans and nature. Another reason for choosing natural materials in the design process is that all products to be produced and stored inside the building will consist of environmentally friendly materials that are compatible with recycling.

    Marine plywood was used as the wooden material for the building, and it was done on purpose in order to showcase the relationship of the region with the sea. Moreover, we used wave movements in the formation of the facade to enhance the effect.

    Project Information

    izmir / Turkey

    Stamper

    2022

    5000 m2

    -

    Stamper Industrial Building Project

    Having had an experience of working with inductrial buildings (the depo we designed several years ago) has made great contributions to the desşgn of the current one, We have created the wooden facade that highlights the office and forms the identity of the building.

    The project, which is located in the center of a densely industrial area, is aimed to raise a sustainability awareness in the region. By choosing natural materials we would like to emphasize the interaction between humans and nature. Another reason for choosing natural materials in the design process is that all products to be produced and stored inside the building will consist of environmentally friendly materials that are compatible with recycling.

    Marine plywood was used as the wooden material for the building, and it was done on purpose in order to showcase the relationship of the region with the sea. Moreover, we used wave movements in the formation of the facade to enhance the effect.

    Project Information

    Location: izmir / Turkey

    Company: Stamper

    Year: 2022

    Project area: 5000 m2

    Construction area: -

    bedava deneme bonusu